Jofra Field

The Jofra field, formerly known as “The Crater Field”, is located at a distance of 100km from the Ghani field. Jofra is Harouge’s first production field dating back to 1963, with 10,000 bpd at that time. The main reservoirs include Mabruk, Thalith and Kalash.

A small industrial unit was also established in the area so as to utilise toxic Hydrogen Sulphid gas so as generate energy for the needs of the Jofra field.

Intranet

قسيمة الراتب (Payslip)

قسيمة الراتب (Payslip)

 

Oil Industry News